The national transporter is working on a plan to upscale the railway network to high speed potential. The non-AC coaches, however, will continue to be there in trains running at lower speeds.
Source link
The national transporter is working on a plan to upscale the railway network to high speed potential. The non-AC coaches, however, will continue to be there in trains running at lower speeds.
Source link